Recommendation Election Administration, paragraph 7 (Election Administration) Nigeria 2003
http://aceproject.org/ero-en/regions/africa/NG/nigeria-final-report-nationally-assembly/at_download/file
Enhancement of logistical and operational capacity, both at the State and LGA level. The first step could be the establishment of a logistic database, maintained centrally, built upon the figures available in the electronic voter register. For the delivery and collection of election material, specific and detailed tracking and accountability mechanisms should be put in place.
